Newcastle University
Browse
UKES2019_Poster1_20190902.pdf (2.17 MB)

Heat Map Construction for Storage integration in the Distribution Network of the Isle-of-Wight

Download (2.17 MB)
poster
posted on 2020-09-04, 11:08 authored by Vahid VahidinasabVahid Vahidinasab, Adib Allahham, Damian Giaouris, Haris Patsios, phil taylor, Jim Fawcett
The aim of this paper is to present the methodology used to construct the heat map of the distribution network in the Isle of Wight (IoW). The main usage of the resulted heat map is to assess the voltage and power flow constraints of the renewable integrated distribution network in IoW and accordingly decide on the integration of ESSs to solve the technical issues of that grid.

Funding

This work was supported in part by the InteGRIDy Project through European Union’s H2020 Research and Innovation Programme under Grant 731268.

History