<p><b>Monitoring Green Infrastructure: Design and commissioning of pilot scale bioretention cell lysimeters</b></p><p><b><br></b></p><p> </p><p>This resource documents the commissioning of the EPSRC-funded Urban Green DaMS (Design and Modelling of SuDS) lysimeters, based at the UKRCIC National Green Infrastructure Facility. The following resources are available within this DOI record:</p><p><br></p><p><b>1) Lysimeter filling - Phase 1 (drainage components)</b></p><p><b>2) Lysimeter filling - Phase 2 (SuDS substrate and sensors)</b></p><p><b>3) Vegetation scenarios (planting styles)</b></p><p><b>4) Full lysimeter commissioning and technical specifications</b></p><p><i><u><br></u></i></p><p><b>Further information:</b></p><p><i><u><br></u></i></p><div><div><div><p>This work forms part of the wider Urban Green DaMS (Design and Modelling of SuDS) research programme currently underway at the University of Sheffield (EPSRC EP/S005536/1) and Newcastle University (EPSRC EP/S005862/1). </p></div></div></div><p><i><u><br></u></i></p><p>Please contact <a href="mailto:daniel.green@newcastle.ac.uk">daniel.green@newcastle.ac.uk</a> or <a href="mailto:ross.stirling@newcastle.ac.uk">ross.stirling@newcastle.ac.uk</a> for more information. Alternatively, you can contact us via the NGIF email (green.infrastructure@newcastle.ac.uk) or via Twitter (@NGIF_UK).</p>