ARCHIVE
ARCHIVE
ARCHIVE
ARCHIVE
ARCHIVE
ARCHIVE
TEXT
1/1
Simulated retention ponds in the Briad Burn catchment using Shetran hydrological model
Set of 65 shetran hydrological model simulations of the Briad Burn catchment, Edinburgh.
These concern the effect of putting combinations of 4 retention ponds in the catchment for 8 annual maximum rainfall events and 2 design events . Namings can be seen here:
shetran-simulations-namings.txt