Newcastle University
Browse
- No file added yet -

Section 3.1 Waste water parameters Set II

Download (86.33 kB)
dataset
posted on 2023-08-17, 08:23 authored by Irina OfiteruIrina Ofiteru

The dissolved oxygen (DO), pH and temperature for wastewater in the BEWISe pilor plant facility, measured continuously with the online sensors over the period of healing (56 days) for the Set II sample (time period 01/07/2022 - 29/09/2022).

Funding

This work was funded by EPSRC Standard Grant Engineering Microbial-Induced Carbonate Precipitation via Meso-Scale Simulations (eMICP) (Newcastle University EP/S013997/1; University of Bath EP/S013857/1; Cardiff University EP/S01389X/1).

History

Usage metrics

    Newcastle University

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC